Home Elevators for Builders, Remodelers & Architects

Design the elevator in before the framing goes up. It’s the simplest way to give your clients a home elevator without a change order, a re-framed wall or a lost closet. Home Accessibility Solutions is a family-owned company founded by a licensed elevator mechanic. We work with home builders, remodelers and architects across Kansas, Oklahoma, Arkansas and Missouri, and one team carries the elevator from plan review through installation and service.

Find builder services in your area

Elevators builders spec

Savaria EclipseResidential Elevator

Savaria Eclipse

The Savaria Eclipse is Savaria’s best-selling home elevator — a traditional shafted residential elevator with a space-saving, machine-roomless design.

  • Up to 1,000 lb capacity
  • 3-yr parts warranty
  • Up to 50 ft / 5 stops (6 where code permits)
View Product
Savaria InfinityResidential Elevator

Savaria Infinity

The Savaria Infinity is the smooth-riding one: Savaria’s hydraulic drive home elevator, with a deserved reputation as both extremely smooth and superbly quiet.

  • Up to 1,000 lb capacity
  • 3-yr parts warranty
  • Up to 50 ft / 5 stops (6 where code permits)
View Product
Savaria ZenithResidential Elevator

Savaria Zenith

The Savaria Zenith is the top-of-the-line home elevator: all the trappings of a commercial elevator in a space-saving design built for your home.

  • 1,400 lb capacity
  • 3-yr parts warranty
  • Up to 50 ft / 6 stops
View Product
Savaria Vuelift MiniGlass Elevator

Savaria Vuelift Mini

The Savaria Vuelift Mini is a panoramic round home elevator that arrives with its own factory-built see-through hoistway, so there is no elevator shaft to construct.

  • 500 lb capacity
  • 3-yr parts warranty
  • Up to 50 ft / 6 stops
View Product
Stiltz Trio AltaThrough-the-Floor

Stiltz Trio Alta

The Stiltz Trio Alta is the wheelchair-accessible member of the Stiltz homelift family — a spacious shaftless home elevator designed to carry a full-sized wheelchair or up to three…

  • 550 lb capacity
  • 2-yr parts warranty
  • Travel to 19′ 8″ / up to 3 floors
View Product
SHC Outlook Outdoor ElevatorOutdoor Elevator

SHC Outlook Outdoor Elevator

The Outlook is Staying Home Corporation’s outdoor lift/elevator — built to carry you between ground level and a raised deck, porch, or elevated main floor, outside the house, in all four…

  • 500 lb capacity
  • Warranty confirmed in writing
  • Travel to 21 ft / 2-3 stops
View Product

What We Do for Builders and Architects

Pre-Construction Plan Review

Send us the plans early and we’ll check the details that make or break an elevator install:

  • Shaft space sized for the unit you or your client have in mind
  • Pit depth the manufacturer calls for
  • Top-floor overhead above the highest landing
  • Power, including the dedicated circuit
  • Load paths for the rails and equipment

Shaft Framing, Pits and Pads

We frame elevator shafts with the anchors and blocking the rails need, and we pour pit and pad concrete to manufacturer spec.

Layouts, Drawings and Engineering

We provide elevator and lift layouts and drawings for permit submittals and for your field team. If the job calls for stamped drawings, we coordinate the structural engineering.

Permits, Inspection, Installation and Service

We handle the permit submittals and inspection coordination for the lift, install the equipment with our own crew, and stay on as the service contact after your clients move in.

Building a New Home? Put the Elevator in the Plan

Most people search for a home elevator after the stairs have already become a problem. Building new is the one time you can skip that problem entirely. Three in four adults 50 and older want to stay in their homes as they age, according to AARP’s 2024 Home and Community Preferences Survey. A home elevator, or a home built ready for one, is how a two-story or walkout-basement house keeps working for the people who live in it.

Whether you are the builder, the architect or the family building the house, the decision comes down to two paths:

Install the elevator now

  • The shaft, pit, overhead and power are built in from day one, so nothing gets re-framed later.
  • The cab finish, gate and doors are chosen with the rest of the interior, so the elevator looks like it belongs.
  • It is ready to use the day you move in, for aging parents, a recovering knee, groceries, luggage or laundry.

Build it elevator-ready and add the elevator later

  • Stack closets on each floor and size them to the manufacturer’s hoistway drawing for the model you would pick.
  • Plan the pit and the top-floor overhead into the design now, while it is still lines on paper.
  • Run the dedicated circuit and a phone line while the walls are open.
  • When the day comes, the closets become the shaft and the install is far less disruptive than starting from scratch.

Either way, the plan review is the same and it costs you nothing to have us look. It is a strong selling point for the listing, and it saves the next owner from tearing into finished space.

How It Works

  1. Send your plans by email or give us a call.
  2. We review them and flag shaft, pit, overhead, power and load-path items.
  3. We provide layouts and drawings and coordinate engineering where it’s required.
  4. We frame the shaft and pour the pit or pad, or coordinate with your crew.
  5. We install, handle inspection coordination and stay on for service.

Where the Elevator Fits in Your Build Schedule

An elevator touches several trades, but the elevator itself goes in late in the job. Here is the typical order on a new home:

  1. Design and plan review. Pick the model and send us the plans. We confirm the hoistway size, pit, overhead, equipment location and power against the manufacturer’s drawing.
  2. Foundation. The pit is formed and poured with the footings or slab, to the depth the model calls for.
  3. Framing. The hoistway is framed plumb and square, with the rail wall blocked and backed where the rail brackets land.
  4. Rough-in. The electrician runs the dedicated circuits and the phone or low-voltage line to the controller location.
  5. Drywall and fire rating. The hoistway is finished to whatever your local building department requires.
  6. Finished floors. Floor heights at each landing are locked in, so the cab sits flush with the finished floor.
  7. Elevator install. Rails, cab, doors and controls go in. A Savaria Eclipse typically takes 5 to 7 days once the hoistway is ready.
  8. Inspection and handover. We coordinate the elevator inspection and show the owners how everything works.

Residential Elevator Rough-In Checklist

Use this as a starting point for your plans and your trades. The exact numbers always come from the manufacturer’s drawing for the model, cab size and door layout you choose, and we send it before framing.

  • Hoistway size drawn to the manufacturer’s spec for the cab and door layout.
  • Pit depth poured to the model’s spec (see the table below), or a pitless model if the slab is already in.
  • Overhead from the top landing’s finished floor to the underside of the hoistway ceiling.
  • Rail wall framed and blocked for the rail brackets. Keep plumbing, ductwork and wiring out of it.
  • Equipment location: a closet for an MRL controller, or a machine room or cabinet for a hydraulic pump.
  • Power: the dedicated circuits the model calls for, plus cab lighting where required.
  • Phone or low-voltage line to the controller for the in-cab emergency phone.
  • Landing doors and gates set to the clearances in the safety code.
  • Finished floor thickness at every landing, so the cab stops level.
  • Fire rating, smoke detection and any sprinkler requirements, which come from your local building code and the authority having jurisdiction.

New Construction vs. Adding an Elevator Later

Designed into a new homeAdded to a finished home
PlanningShaft, pit and power drawn before framingStarts with a site visit to find a location that works
StructureRail wall and pit built right the first timeFloors cut, walls opened and re-framed
DisruptionFolded into the build scheduleConstruction inside a lived-in home
FinishesCab matched to the interior from the startPatching and refinishing around the shaft
OptionsEvery shafted, MRL, hydraulic or glass modelOften pitless or through-the-floor models

Already living in the house? See our home elevators and through-the-floor elevators, built for homes that are already finished.

Spec the Right Residential Elevator: MRL, Hydraulic or Custom Luxury

Residential elevators for new construction go smoothest when the elevator is in the plans before framing. The model you pick sets the shaft, the pit, the overhead and where the equipment lives. Here are the options builders and architects spec most often:

  • MRL (machine-room-less) elevators keep the drive in the hoistway, so there is no machine room in the plan: the Savaria Eclipse and Zenith, the REI Luxury Lift LLT, and the Inclinator Elevette with its MRL drive.
  • Hydraulic home elevators give a smooth, quiet ride and the lowest overhead, with a small machine room or cabinet for the pump: the Savaria Infinity, the REI Luxury Lift LLH and the Inclinator Elevette HydraRide.
  • Custom luxury elevators help sell the house: handcrafted Residential Elevators cabs in real hardwood, the commercial-grade Savaria Zenith, or a glass elevator as the centerpiece.
  • Pitless and low-pit options for slabs that are already poured, and for remodels: REI The Level and the SHC EZ6 need no pit.
ModelDriveMinimum pitOverheadMachine room
Savaria EclipseMRL, geared chain8″ (6″ may be possible)96″None. Controller in a closet
Savaria ZenithMRL traction, 1,400 lb10″108″None. Small utility space
REI Luxury Lift LLTMRL traction8″102″None. Controller overhead in the shaft
Savaria InfinityHydraulic8″92″ (80″ cab)Separate 4′ × 5′ room
REI Luxury Lift LLHHydraulic8″96″ (106″ with EON doors)Compact cabinet at the lowest landing
REI The LevelPitlessNone (2-1/2″ step up)108″ (6′8″ cab)None

Figures are from each manufacturer’s published specifications. Local code can change them. We send the manufacturer’s hoistway drawing for your exact cab and door layout before framing.

Why Builders Work With Us

  • Founded by a licensed elevator mechanic, so plan review comes from people who install and service elevators.
  • One point of contact for review, framing, concrete, drawings, permits, install and service.
  • Six manufacturers: Savaria, Residential Elevators, Inclinator, AmeriGlide, Staying Home and Stiltz.
  • Long-term service after the closing, including on lifts other companies installed.

Building for a homeowner who needs a lift now? See the areas we serve for stair lifts, home elevators and platform lifts.

Codes, Standards and Planning Resources

These are the references we work from. They are useful for builders, architects and homeowners planning a new build:

Builder and Architect FAQs

When should a builder bring in the elevator company?

As early as possible, and before framing at the latest. Once the shaft, pit, overhead and power are set in the plans, the rest of the job goes smoothly and nothing has to be torn out.

What is an MRL elevator, and why do builders spec it?

MRL means machine-room-less. The drive rides inside the hoistway and the controller fits in a closet or small utility space, so you never have to find room in the plan for a machine room. The Savaria Eclipse, Savaria Zenith, REI Luxury Lift LLT and the Inclinator Elevette with its MRL drive all work this way. On the LLT, even the controller sits overhead in the shaft.

Should we plan an MRL or a hydraulic elevator?

It depends on where the house has room. An MRL elevator needs no machine room: the controller fits in a closet, or on the REI Luxury Lift LLT it rides overhead in the shaft. A hydraulic elevator needs a small machine room or cabinet for the pump, but can need less overhead, as little as 92 inches on the Savaria Infinity. We compare both against your plans.

What does a hydraulic home elevator need in the plan?

Room for the pump. The Savaria Infinity uses a separate 4-foot by 5-foot machine room, usually in the basement or a utility area. The REI Luxury Lift LLH keeps its power unit in a compact metal cabinet near the hoistway at the lowest landing. Both need an 8-inch pit; overhead is 92 inches on the Infinity with the standard cab and 96 inches on the LLH.

What hoistway, pit and overhead should we draw?

It depends on the model, cab size and door layout. Pits run 8 inches on the Savaria Eclipse and Infinity and the REI LLT and LLH, and 10 inches on the Savaria Zenith and the REI Vision glass cab. Overhead runs from 92 inches on the Infinity to 108 inches on the Zenith. Published hoistway examples: up to 55-1/2 by 63-1/2 inches on the REI LLH, a recommended 60 by 60 inches finished for a 15 square foot Vision cab, and 48 by 55 inches finished for a front-entry SHC EZ6. We send the manufacturer’s hoistway drawing for your exact configuration.

What should our electrician rough in?

It depends on the model, so we send the exact spec. Two examples: the REI Luxury Lift LLT calls for a dedicated 240-volt, 30-amp circuit, a 120-volt, 20-amp circuit for cab lighting and a phone line, and the REI LLH needs two dedicated circuits plus a phone line. Staying Home Corporation elevators run on batteries charged from a standard 120-volt outlet.

Does the elevator shaft need to be fire rated?

That comes from your local building code and the authority having jurisdiction, not from the elevator manufacturer, and it varies from one city and county to the next. We check the requirements during plan review, before the shaft is framed.

What custom and luxury options can we offer our buyers?

A lot. Residential Elevators cabs are hand-built in the U.S. from seven-ply, cabinet-grade plywood with all-hardwood trim and custom stains, in Classic, Shaker, Signature or Reserve styles, or glass and stainless. Gates and doors include the Millennium, Century scissor, Curve, Vision Auto-Glide and EON automatic doors. Savaria offers the Luxury Flush Door and the commercial-grade Zenith, which carries 1,400 pounds. We bring samples to the design meeting with your buyer.

Can we put a glass elevator in a new build?

Yes. The Savaria Vuelift Round, Octagonal and Mini arrive with their own factory-built, see-through hoistway, so there is no shaft to frame, and the pit can be as shallow as 3 to 12 inches depending on the model. The REI Vision is an all-glass cab that rides on REI’s LLT or LLH drive in a framed hoistway with a 10-inch pit. See our glass elevators.

The slab is already poured. What are our options?

You still have choices. REI’s The Level is a pitless shafted elevator that sits on the existing floor with a 2-1/2 inch step up, the SHC EZ6 needs no pit and only 86 inches of overhead, and a through-the-floor elevator needs no shaft and no pit at all. The same options work for remodels and additions.

How long does the install take once the hoistway is ready?

It depends on the model. A Savaria Eclipse typically installs in 5 to 7 days once the hoistway is ready, and a Savaria Vuelift Mini usually takes 4 to 5 days because it brings its own hoistway. We set the install date around your schedule at the start of the job.

Which safety code do residential elevators follow?

ASME A17.1, the national safety code for elevators. Section 5.3 covers private residence elevators, and Residential Elevators models meet or exceed it. We handle the elevator permit and inspection.

Can you frame the shaft and pour the pit?

Yes. We can frame the shaft and pour the pit or pad ourselves, or give your crew the drawings, anchor and blocking locations and coordinate with them.

Should I put an elevator in my new house?

If the house has more than one level and you plan to stay, it is worth planning for now. You can install the elevator during the build, or build the house elevator-ready with stacked closets, a planned pit and overhead, and the power roughed in, then add the elevator later. Either way, plan review comes first.

Can we build a home elevator-ready and add the elevator later?

Yes. Stack closets on each floor sized to the manufacturer’s hoistway drawing, plan the pit and top-floor overhead, and rough in the dedicated circuit and phone line while the walls are open. When the time comes, the closets become the shaft.

When does the elevator get installed during construction?

Late in the job. The pit is poured with the foundation, the hoistway is framed with the house, and power and phone are roughed in with the other trades. The elevator itself goes in after drywall and finished floors, so the cab sits level with the floor at every landing.

How much space does a home elevator need in a new build?

It depends on the model, cab size and door layout. Published examples include up to 55-1/2 by 63-1/2 inches on the REI Luxury Lift LLH, a recommended 60 by 60 inches finished for a 15 square foot REI Vision cab, and 48 by 55 inches finished for a front-entry SHC EZ6. We send the exact hoistway drawing before framing.

Who inspects and permits a residential elevator?

It depends on the state. Oklahoma, Missouri and Arkansas each run a state elevator program, and Kansas has no statewide elevator license, so permits run through your city or county. We handle the elevator permit and coordinate the inspection.

Do residential elevators have to meet ADA rules?

ADA rules are written for public buildings and businesses. Elevators in a private home follow ASME A17.1, the national elevator safety code, which covers private residence elevators in Section 5.3, along with your local building code.

Do you work outside Wichita?

Yes. We work with builders across Kansas, Oklahoma, Arkansas and Missouri, including the Oklahoma City and Tulsa metros, Northwest Arkansas, Central Arkansas and the Springfield, MO area.

Who services the elevator after closing?

We do. The same licensed team that installs the elevator services it afterward, and we also service lifts other companies installed.